Tuesday, August 31, 2010
im here
have totaly moved in to cumberland crossing i have left woodchase behine mostly all that left is to pay the move out fees. yestday i talk to the lease office here about some of the stuff that need fixed. i hope they well fix them soon.
Saturday, August 28, 2010
bathroom
i tried to ask a shower and when i when to turn the water on the fasit was licking.
the sliding glass door is still not fixed. i need to call the office about the need repair
the sliding glass door is still not fixed. i need to call the office about the need repair
moving in
last night we the first night we slept at Cumberland crossing last night. still moving in. the washer and dryer are having trouble fitting into the room i think some of the seccer gate and the door code r not working and the sliding glass door still need to be fixed. im hoping to get thing fixed soon. we have started to set up the master bed room. i m trying to look for a bed and other stuff for gabby room. my plan is a fairy theam for her room.
i m also hope to chage all the light in the apt to l e d. that should save on the power bill.
the last apt the gas was 100 a month the power bill was also 100 the cable 200 so monthly untils where 400 a month
as of now the cable bill is 120 that an $80 saving. we well see what the rest is soon
i m also hope to chage all the light in the apt to l e d. that should save on the power bill.
the last apt the gas was 100 a month the power bill was also 100 the cable 200 so monthly untils where 400 a month
as of now the cable bill is 120 that an $80 saving. we well see what the rest is soon
Sunday, August 22, 2010
day two
today i got a hold of the leasing office and ask to have the sliding door fix and the lights in the kitchen. i also ask why the price on our lease is different the the price we were hold when we look at the apartment. it seem the even those i had said i don't need a fireplace or want a fireplace it seem we have a fireplace which cost more. i m hoping the door with be fixed soon so we can move more stuff in.
i know the building is old but i think the building has a major problem with erosion and the foundation is settling.
i know the building is old but i think the building has a major problem with erosion and the foundation is settling.
Saturday, August 21, 2010
our frist day
today we started moving in. the sliding glass door need to be fixed. i try calling the office today but they where closed and for now it should be fine. the light in the kitchen is about the burn out. the main door to the building was ported open and need to be checked or we need to ask about. the porch need work as well as the landscaping.
Subscribe to:
Posts (Atom)